What would an ADU actually cost on your lot?

Pick a build type, a size and your state. You get an itemised cost range, the permit and impact-fee notes that change it, and a rent-and-return estimate — built from published 2026 cost research, not a national average with the hard parts left out.

Photograph of a modern detached backyard ADU with dark wood siding and an orange front door, in a landscaped garden with the main house behind it
Photo — a detached backyard ADU in front of the main house. Photo credits are listed with the sources at the bottom of the page.

Estimates only — not a quote. Every figure on this page is a range from the published research listed under Sources, checked 6 November 2026. ADU costs, permits and impact fees change by city and by year. Confirm your numbers with a local contractor and your city’s permit office before you commit money.

~$180,000
National average for a detached ADU
Cottage / Maxable, via FindaTinyHouse
$110,000
Average garage conversion in 2026 — most run $60k–$150k
Angi, Oct 2026
$150–$300
Typical cost per square foot, site-built
BuildWithAPlan / SelfStorage
$20k–$50k
Site work — the line builder quotes often leave out
Research §1C, keyword gap #1

ADU cost calculator

Four build types, priced the way the research prices them: detached and prefab by state cost per square foot, garage conversions and junior ADUs on the conversion range. Change anything — the estimate, breakdown and permit notes update as you go.

Your project

Build type
Finished size
600square feet

Your city personalises the permit notes. City-level fee tables were not verified in the research — that gap is flagged in your result, not filled with a guess.

Site-work allowance

Grading, utility trenching and hookups. The research flags this as the cost most often missing from headline quotes.

The research gives no verified rent figures by city, so rent is yours to enter — the return maths below uses only this number.

Your estimate
—
Cost lineEstimate

Permit & fee notes for this project

    Rent & return

    Enter an expected monthly rent on the left to see gross annual rent, a simple payback period, and gross yield on the mid estimate.

    Gross figures only. The real return is rent minus loan payments, property tax, insurance and vacancy — none of which the research prices by city, so they are not estimated here.

    The four build types, side by side

    Every range below is the range the research itself publishes. Where the research gives no separate figure for a type, the table says so instead of borrowing a number from somewhere else.

    Photograph of a small detached ADU with cream siding, a black roof and sliding glass doors opening onto a lawn
    Detached ADUA new standalone unit in the backyard, site-built.
    Photograph inside a converted garage ADU — open-plan living room and kitchen, with a bedroom beyond a sliding barn door
    Garage conversionInside a finished conversion — living space where cars used to park.
    Photograph of a compact junior ADU interior with a small white kitchen, sofa and round dining table
    Junior ADU (JADU)A compact unit under 500 sq ft, carved from the existing home.
    Photograph of a modern prefab backyard unit with cedar siding, large sliding glass doors and a wooden deck
    Prefab ADUA factory-built unit delivered and set on the lot, deck and all.
    TypeCost basis in the researchTimelineWatch out for
    Detached ADU $150–$300/sq ft typical; California $320–$350+/sq ft; Texas ~$250–$265/sq ft. National average ~$180,000. Site-built: 6–18 months (vendor ranges) Site work of $20k–$50k is often excluded from the headline quote.
    Garage conversion $120–$220/sq ft; totals $45k–$150k. Angi average $110,000 in 2026, most $60k–$150k. Not stated in the research The itemised lines that decide the real price: slab, plumbing, electrical-panel upgrade, insulation, egress.
    Junior ADU (JADU) No separate $/sq ft in the research — the calculator prices it on the garage-conversion range and labels it as a benchmark. Defined as under 500 sq ft. Not stated in the research Rules differ from a full ADU: owner-occupancy and kitchen/bath sharing rules apply in the California-focused guidance the research draws on.
    Prefab ADU No separate $/sq ft in the research — priced here on the national $150–$300/sq ft range, plus site work. Delivery in 2–8 weeks vs. 6–18 months site-built (vendor ranges) Vendor prices often omit delivery, crane and utility-hookup costs — ask for them in writing.

    City & state guides

    California and Texas are the two states the research prices directly. Florida is a high-demand search state with no verified state price in the research — its guide says exactly that. Below the state cards, the city layer: how your city’s tier changes permits and timelines, and a live guide for the city you entered in the calculator.

    Photograph of a light-blue detached backyard ADU beside a wooden fence, with the main house behind it Priced in the research

    California

    ~$340/sq ft (BuildWithAPlan anchor; range $320–$350+). California has a statewide ADU law, and is one of the reform states driving national demand.

    • Impact fees: waived for ADUs under 750 sq ft — the single biggest fee lever in the state.
    • JADU rules in California guidance cover owner-occupancy and shared kitchen/bath arrangements.
    • Confirm your city’s current fee schedule and timelines — they still vary locally.
    Photograph of a brick suburban home with a two-car garage and a large front lawn in Temple, Texas Priced in the research

    Texas

    ~$264/sq ft (BuildWithAPlan anchor; range ~$250–$265) — well under California, which is why the same floor plan pencils out very differently here.

    • Texas is not listed among the states with a statewide ADU law in the research — your city’s zoning decides.
    • Start with the parcel check in the topic guides: zoning, setbacks and lot coverage.
    • Get the permit and impact-fee schedule from your city before you price the build.
    Photograph of a stucco Florida home with palm trees, a tiled roof and a paved driveway Price not verified — open question

    Florida

    Florida is one of the three state variants searchers ask about most, but the research found no verified Florida $/sq ft. The calculator therefore prices Florida projects on the national $150–$300/sq ft range.

    • Treat any Florida-specific figure you see elsewhere as unverified until a local contractor confirms it.
    • Ask your city for its ADU rules, permit costs and impact fees in writing.
    • If you get two or more real Florida quotes, they are worth more than any national table — including this one.

    States with statewide ADU laws

    Per the research: California, Oregon, Washington, Vermont and Connecticut have statewide ADU laws, and 40+ states have introduced ADU-friendly legislation since 2020. A statewide law does not set your price — it mainly decides whether your city can block the project. Everywhere else, and for every fee, your city and county rules govern. Confirm locally.

    City guides — your city’s tier decides the permit story

    The research splits permit timelines by city tier, not by state — and it verified no per-city fee table, so no honest page can quote your city’s fees from national data. What a city guide can do is tell you which tier your city is in and exactly what to pull from it. That is what these two guides and the live panel below do.

    City tier 1

    The ADU-friendly city

    Cities in states with statewide ADU laws, and cities that have streamlined ADU permits, sit in this tier. Reviews move, fee schedules are published, and pre-approved plans may exist.

    • Still confirm: total fees for your size, and whether an impact-fee waiver applies (in California, under 750 sq ft).
    • Ask for the current average review time — friendly cities publish it.
    • Your risk here is less the permit, more the build queue: 6–18 months site-built in the research’s vendor ranges.
    City tier 2

    The slow city

    No statewide ADU law behind you, a zoning code that predates ADUs, or a permit office that treats each application as a special case. This is where projects stall — usually on an incomplete application, not the review itself.

    • Book a pre-application meeting before paying for drawings.
    • Get three answers in writing: is an ADU allowed on my lot, total fees, current review time.
    • Check short-term-rental and owner-occupancy rules before you count any rent.

    Your city guide

    Where you’re buildingEnter your city in the calculator above
    State law position—
    Cost basis used—
    Fee lever to check first—

    Pull these five from your city before you price the build

    • Your parcel’s zone, and its setbacks, lot-coverage and minimum-lot-size numbers
    • Total permit + impact fees for your unit’s size, in writing
    • Current average permit review time
    • Owner-occupancy, parking and short-term-rental rules for ADUs
    • Whether pre-approved ADU plans exist — they cut both design cost and review time

    Topic guides — the questions around the cost

    The eight decisions the research found national pages glossing over. Each guide states what is actually known, and flags what only your city, lender or attorney can answer.

    Can I build on my lot? Zoning, setbacks, lot size

    City code PDFs are close to unreadable, which is why this is the most-searched question in the cluster. Work it in this order:

    • Find your parcel on your city’s zoning map and note the zone.
    • Check three numbers for that zone: minimum lot size, rear/side setbacks, and maximum lot coverage.
    • Work one example with your real measurements before paying for drawings — if the unit plus setbacks exceeds lot coverage, the project stops there.

    ADU vs. tiny house on wheels

    A tiny house on wheels is banned in roughly 80% of US municipalities (FindaTinyHouse figure) as a permanent dwelling. An ADU is a permitted structure on your own lot, which is why it can be financed, insured and rented as housing.

    • Legal where you live? ADU: yes in the five statewide-law states, city-dependent elsewhere. THOW: usually no.
    • If a seller tells you a THOW needs no permit, treat that as the red flag it is — confirm with your city.
    Photograph of a site-built ADU under construction — wood framing and roof trusses going up in a backyard

    Prefab vs. site-built

    Prefab vendors quote 2–8 weeks delivery; a site-built ADU runs 6–18 months (vendor ranges). The speed is real — the price comparison usually is not, because prefab quotes commonly leave out:

    • Delivery and crane placement
    • Foundation and utility hookups
    • Site work — the same $20k–$50k line

    Ask any prefab vendor for an all-in price in writing, with those three lines itemised, before comparing it to a builder’s quote.

    Financing: HELOC, cash-out refi, FHA 203(k), construction loan

    Lender pages sell loans; the research’s gap is an independent comparison. No rates are published here — the research verifies none — so compare on structure instead:

    • HELOC: draws on existing equity; fits phased builds like garage conversions.
    • Cash-out refinance: replaces your mortgage; compare the new rate on the whole balance, not just the ADU amount.
    • FHA 203(k) / construction loan: built for projects, with draws and inspections — more paperwork, purpose-made.
    • The appraisal problem: ADUs often have no comparable sales nearby, so the appraised value can come in under build cost. Ask your lender how they handle that before you apply.

    Permits: cost and how long approval takes

    Permit timelines split by city tier — ADU-friendly vs. slow — more than by state. The research does not publish a verified per-city fee or day count, so:

    • In California, check the under-750 sq ft impact-fee waiver first — it can remove a whole fee category.
    • Ask your permit office two questions in writing: total fees for your size, and current average review time.
    • The common delay is an incomplete application, not the review itself — a pre-application meeting is usually the cheapest week you will save.
    Photograph of a small grey backyard cottage with a garden path, set between two houses

    A backyard cottage for an aging parent

    “Granny pod” and backyard-cottage options for a parent run $40,000–$250,000 in the roundups the research cites. Beyond price, weigh:

    • Accessibility from day one: step-free entry, a bathroom that fits a carer, door widths.
    • Proximity vs. privacy — close enough to help at 2 a.m., separate enough for two households.
    • Medicaid and estate implications of building on your lot with a parent’s money — talk to an elder-law attorney before funds move. This page cannot advise on that.

    Does an ADU raise my property value — and my tax?

    Realtor pages hand-wave this; the assessor does not. Two separate realities:

    • Value: added value is not the same as build cost. Appraisals depend on comparable rentals and sales, which may not exist yet in your neighbourhood.
    • Tax: a new permitted structure is normally reassessed by your county. Budget for a higher tax bill from completion, and confirm the reassessment rules with your county assessor.
    Photograph of a finished, furnished ADU interior — open kitchen and living room with sliding doors onto the garden

    Rental rules: Airbnb or long-term only?

    Whether you can short-term-let an ADU is a city rule, and it is one of the most-searched questions in the cluster. Before you count any rent:

    • Check your city’s short-term-rental rules for ADUs specifically — many cities allow long-term rental but ban ADU Airbnbs.
    • Check owner-occupancy and parking requirements that attach to the permit.
    • Run the calculator’s return maths on the long-term rent you are actually allowed to charge, not the nightly rate you hope for.

    Before you sign anything — the quote check

    • Is site work ($20k–$50k in the research) inside the quote, or listed as “TBC”?
    • For a garage conversion: are slab, plumbing, electrical-panel upgrade, insulation and egress each a named line?
    • For prefab: are delivery, crane and utility hookups priced, in writing?
    • Are permit and impact fees included — and if you are in California under 750 sq ft, has the impact-fee waiver been applied?
    • Does the total assume your city allows the unit at all? One zoning confirmation is cheaper than one redesign.